INTEGRATED - MODULAR & FAST-TRACK ENGINEERING & CONSTRUCTION - Stick built method
Global Engineering & Modular Skid SolutionsGLOBAL EXECUTIVE PORTAL
Engineering Excellence
Modular Skid Design Concept
We transform complex industrial processes into high-efficiency, skid-mounted units. Our concepts focus on Off-site Manufacturing (OSM) to ensure precision, safety, and rapid site integration.
Plug-and-Play
Pre-wired and pre-piped units for immediate utility connection upon delivery.
FAT Optimized
100% Factory Acceptance Testing (FAT) conducted before shipment to eliminate site errors.
Compact Footprint
3D-BIM optimized layouts reducing space requirements by up to 30%.
Global Logistics
Designed within standard container dimensions for cost-effective global transport.
TECHNICAL SPECIFICATION: SKID-MOD-V8
Fast-Track Metrics
Discipline Performance
CIVIL (Pre-cast & Foundations)94%
MEP (Skid-Mounted Racks)88%
ELECTRICAL (Modular Sub-stations)91%
MACHINERIES (Integrated Process Skids)96%
Modular Advantage
By utilizing **Modular Skid Design**, site-based mechanical works are reduced by 70%, allowing Civil and Machinery installation to happen in parallel.
-10 Months
Average Schedule Compression
Global Case Studies
Modular Infrastructure
CHINA · FMCG
P&G Modular Plant
Full-scale modularization concept for rapid market entry.
EUROPE · LOGISTICS
ASRS Distribution Hub
Automated storage systems with modular MEP integration.
Our Approach
Implementation Roadmap
01
Strategic Planning
CAPEX modeling and modular feasibility studies aligned with global standards.
02
BIM Engineering
High-fidelity 3D modeling of skids, MEP, and Civil interfaces.
03
Off-site Fab
Concurrent manufacturing of all disciplines in a controlled environment.
04
Plug-and-Play
Final on-site assembly and commissioning with zero hot-work requirements.
Global Portfolio
High-Performance Infrastructure
Modular Assembled Steel
P&G Manufacturing Hub
Modular systems implemented in India, Afrika, Greater China.
CIVIL & FOUNDATION
P&G Manufacturing Hub
Modular foundation systems implemented in Greater China.
MEP & MACHINERIES
Automated ASRS Facility
Plug-and-play MEP racks for rapid European deployment.
Data Driven
Fast-Track Analytics
Discipline Readiness (Modular)
CIVIL (Pre-cast Foundations)94%
MEP (Skid-Mounted Systems)88%
ELECTRICAL (Modular Panels)91%
MACHINERIES (Integrated Units)96%
TRADITIONAL TIMELINE
24 Months to Handover
MODULAR FAST-TRACK
14 Months to Handover
40% Schedule Compression Achieved
Our Methodology
The Fast-Track Approach
01
Strategic Alignment
Independent governance and CAPEX modelling to align global stakeholder requirements with site reality.
02
Modular Engineering
Parallel design of Civil and MEP components using BIM to ensure 100% off-site compatibility.
03
Concurrent Fabrication
Manufacturing of machinery skids and electrical modules while site civil works are in progress.
04
Rapid Integration
Final "Plug-and-Play" installation and commissioning, reducing on-site labor and safety risks.